The University of Virginia Medical Center chose Affinity Energy to install multi-circuit meters on ATSs around campus. Ultimately, the submeters assist the maintenance supervisor to accurately determine load status during emergency power situations.

University of Virginia Medical Center Success Story

University of Virginia Medical Center

The University of Virginia Medical Center in Charlottesville, Virginia, is a Level One trauma center providing both inpatient and outpatient care. It opened in 1901. The facility has a total of 18 emergency generators. 40 ATS, and 15 facility operators.

Before our ATS submeters, we had zero visibility into our electrical loads. The data I have now gives me the power to mitigate load creep risks and plan for the future emergency power situations of the hospital.

Alex Di Giacomo, Maintenance Supervisor at University of Virginia Medical Center

Challenge:

Due to the University of Virginia Medical Center’s exponential growth, it was becoming increasingly difficult for the central energy plant maintenance staff to keep track of electrical loads in their emergency power supply systems (EPSS).

Like many large medical campuses, they have dozens of automatic transfer switches (ATSs) distributed throughout campus. Unlike new hospitals built within the last 10 years, the University of Virginia Medical Center’s 40 ATSs did not have submeters built-in to the digital controllers.

Over its 30-year lifespan, the hospital has undergone rapid growth. Electrical loads have grown and changed, and it was becoming difficult to determine if the loads were growing over original ATS infrastructure load specifications.

The University of Virginia Medical Center needed visibility into potential load creep situations to avoid ATS failure due to lack of supporting capacity.

Solution:

After assessing the challenges of University of Virginia Medical Center, Affinity Energy implemented an ATS multi-circuit metering retrofit solution to effectively manage load creep in a cost-efficient manner. Instead of installing conventional circuit monitoring on each ATS, Affinity Energy specified Dent PowerScout 24 multi-circuit submeters, significantly lowering hardware and installation costs.

A multi-circuit submeter uses one submeter CPU/circuit board to measure multiple loads. It has only one set of inputs for a common voltage source, and multiple sets of current inputs for loads that share the common voltage source. Because ATSs within the hospital environment were clustered in sets of 7 or 8, the multi-circuit submeter was an ideal solution for retrofitting the University of Virginia Medical Center’s ATSs with submetering capability.

After carefully integrating submeters within this critical infstructure, and adhering to strict OSHA regulations, all data from submeters within the EPSS was integrated into the existing SCADA system.

Read more about how multi-circuit submetering is a cost-effective solution for electrical load profiling

Results:

By recording the submeter data within their SCADA environment, the University of Virginia Medical Center now has the information to accurately analyze load profiles. Using performance analysis, the maintenance supervisor is able to verify loads prior to ATSs switching to emergency, loads during emergency power situations, and loads after the ATS returns to the normal source.

Using this analysis, it’s simple to identify loads added during a power outage and not removed when normal power is restored. This data will help determine if and where a new generator or ATS capacity upgrade is needed.

After gathering data, the medical center will be able to trend year over year load growth to quantify load creep and prepare the data reports necessary to back up budget requests.

Success Stories

Charlotte Pipe & Foundry

Managing energy costs for large industrial facilities can be challenging. Like many manufacturers, Charlotte Pipe and Foundry (CPF) viewed high energy costs as a necessary…

Read More

QTS Data Centers

Data centers and cloud storage are integral components of the digital age. Customers of data centers, both businesses and individuals, demand uninterrupted access…

Read More

Concord Energy

Municipalities looking for a renewable energy source can simply look to their local landfill. First, we won’t be running out of trash anytime soon. Second, the organic waste in landfills…

Read More

UVA Medical Center - Logs & Alerts

Because of the University of Virginia Medical Center's rapid growth, it was difficult to keep track of and access event details in their central energy plant. When generators tripped...

Read More

UVA Medical Center - ATS SUBMETERING

UVA Medical Center has dozens of ATSs distributed throughout campus, but no way of determining if loads were growing over original infrastructure load specifications...

Read More

UNC Chapel Hill - Temperature Control

UNC Chapel Hill needed a solution to regulate temperature in a thousand research rooms...without being held hostage to proprietary programming technology...

Read More

Chesapeake Bay Bridge Tunnel

The Chesapeake Bay Bridge-Tunnel Commission chose Affinity Energy to upgrade their power monitoring SCADA system. The completed system...

Read More

Southeast Hospital System Alarming

A large hospital system in the Southeast with multiple Central Energy Plants needed a way to keep an eye on SCADA and critical alarms at three plants...with just one operator.

Read More

Woman's Hospital - GE Integration

Affinity Energy was chosen by GE for a simple SCADA integration, but ended up also solving several frustrating power monitoring issues for end-user Woman’s Hospital.

Read More

Conetoe Solar Farm

In 2015/2016, Duke Energy Renewables wanted to outfit their new 80MW solar farm in Conetoe, North Carolina with controls and insight into each critical operational piece of equipment...

Read More

Duke Energy Solar Site Monitoring

Duke Energy wished to integrate solar data from North Carolina sites acquired from other solar installers into their overarching SCADA system of renewable resources...

Read More

JLL/Bank of America - CFMS Failure

When the CFMS unexpectedly failed for Bank of America, JLL turned to Affinity Energy for a quick turnaround to get the system back online.

Read More