SunEnergy1: Conetoe Solar Farm Wireless Communications

Success Stories

Wireless Solar Communications Technology Reduces Cost and is Easier to Maintain

In early 2010, wireless technology wasn’t considered robust or reliable enough for industrial environments. A lost data connection could potentially cost millions each minute of downtime.

Now in 2016, wireless connections are considered even more reliable and redundant. They’re preferred in industrial atmospheres, but particularly in large solar environments where miles of cable can be expensive to install and maintain.

Conetoe

SunEnergy1 & Duke Energy Renewables

Duke Renewables and contractor SunEnergy1 built the largest solar farm operating east of the Mississippi, in Conetoe, NC. This vast 800 acre solar farm is comprised of 375,000 solar panels, and was built in just under 10 months.

Working on a solar farm is tough. The unpredictable environment, isolated locations, and taxing schedules challenge even the best of companies.

We've worked with Affinity Energy on over a dozen solar projects. On every single one of those projects, their field services team gets the job done on time. And at the end of the day, that's what is most important to us!

–David Giles, Operations & Maintenance Manager at SunEnergy1

Challenge:

In 2015/2016, Duke Energy Renewables wanted to outfit their new 80MW solar farm in Conetoe, North Carolina with controls and insight into each critical operational piece of equipment. They wanted to see the performance of each solar array, the positional data of the panels tracking system, and the key irradiance data from the site’s four weather stations.

These data points included wind speed and direction, ambient temperature, POA, HOA and BOM sensors data, tracking positions and set points, voltage and KW production. All of these data points are used to access the performance and health of the systems performance at any given point in time, and used to dispatch repair teams accordingly.

Because the site spans over 800 acres, their primary concern was ensuring communication reliability over long distances and the creation of a redundant network to ensure continued reporting should anyone device fail.

Another prominent concern was the cost and downtime of traditional hardwired communications. Not only would a wired infrastructure in a large solar field take months for trenches to be dug, fiber cables to be buried, fiber to be converted into copper, and infrastructure to be wired, the cost of labor and materials would be astronomical. In the long term, troubleshooting, future repair, and accident scenarios (such as accidentally cutting a hidden cable) can result in days to weeks of production downtime.

Solution:

At less than 10% of the cost of a wired infrastructure and with comparable reliability for this particular application, a wireless communications infrastructure was a must-have for the Conetoe solar site. Duke Renewables worked through their contractor, SunEnergy1, to contract with Affinity Energy in early 2016 to design, provide, and install a Weidmuller wireless communications infrastructure that reported back to a web-based supervisory control and data acquisition (SCADA) system.

After conducting a wireless site survey to ensure strong wireless reliability, Affinity Energy solar experts determined 900MH radios would make the most sense for the giant solar farm. Even though 900MH radios are known for providing less bandwidth than industrial 2.4GH, their line of site offers an astounding 20-40-mile radius. In addition, because the data Duke Renewables was interested in receiving was processed, the high bandwidth of 2.4GH wasn’t necessary.

To ensure a honeycomb of redundancy with multiple connections to multiple radios, Affinity Energy set up a wireless mesh network. If a failure happened to occur, it would only affect one radio instead of dropping communications from an entire section of the farm. To reduce complexity to the communications system, Affinity Energy installed 15KW central inverters within the infrastructure.

Results:

In just two weeks, Duke Renewables’ communications structure had a fully-integrated wireless backbone. Due to the simplified network, there are less points of failure, which means Duke Renewables has more peace of mind that even if a radio happens to go bad (a rarity), a new radio can be installed in just half an hour.

After the successful completion of inexpensive, quick, and simple wireless integration, Duke Renewables contacted Affinity Energy again and asked them to install wireless redundancies throughout the solar field for extra security.

Success Stories

Charlotte Pipe & Foundry

Managing energy costs for large industrial facilities can be challenging. Like many manufacturers, Charlotte Pipe and Foundry (CPF) viewed high energy costs as a necessary…

Read More

QTS Data Centers

Data centers and cloud storage are integral components of the digital age. Customers of data centers, both businesses and individuals, demand uninterrupted access…

Read More

Concord Energy

Municipalities looking for a renewable energy source can simply look to their local landfill. First, we won’t be running out of trash anytime soon. Second, the organic waste in landfills…

Read More

UVA Medical Center - Logs & Alerts

Because of the University of Virginia Medical Center's rapid growth, it was difficult to keep track of and access event details in their central energy plant. When generators tripped...

Read More

UVA Medical Center - ATS SUBMETERING

UVA Medical Center has dozens of ATSs distributed throughout campus, but no way of determining if loads were growing over original infrastructure load specifications...

Read More

UNC Chapel Hill - Temperature Control

UNC Chapel Hill needed a solution to regulate temperature in a thousand research rooms...without being held hostage to proprietary programming technology...

Read More

Chesapeake Bay Bridge Tunnel

The Chesapeake Bay Bridge-Tunnel Commission chose Affinity Energy to upgrade their power monitoring SCADA system. The completed system...

Read More

Southeast Hospital System Alarming

A large hospital system in the Southeast with multiple Central Energy Plants needed a way to keep an eye on SCADA and critical alarms at three plants...with just one operator.

Read More

Woman's Hospital - GE Integration

Affinity Energy was chosen by GE for a simple SCADA integration, but ended up also solving several frustrating power monitoring issues for end-user Woman’s Hospital.

Read More

Conetoe Solar Farm

In 2015/2016, Duke Energy Renewables wanted to outfit their new 80MW solar farm in Conetoe, North Carolina with controls and insight into each critical operational piece of equipment...

Read More

Duke Energy Solar Site Monitoring

Duke Energy wished to integrate solar data from North Carolina sites acquired from other solar installers into their overarching SCADA system of renewable resources...

Read More

JLL/Bank of America - CFMS Failure

When the CFMS unexpectedly failed for Bank of America, JLL turned to Affinity Energy for a quick turnaround to get the system back online.

Read More